ROGZ Utility Fixed Long Lead
Out of stock
- SKU
- rogz-hll-c
Description
The ROGZ Utility Fixed Long Lead is a fixed 1.8 m dog lead for everyday walks, with reflective stitching woven into durable nylon webbing.
Key Benefits
- Fixed 1.8 m length for a steady walking distance.
- Reflective stitching for visibility on low-light walks.
- Waste-bag holder and an accessory ring for an ID tag.
- Tough nylon webbing with a die-cast ring and snap hook.
| Size | Webbing width | Length |
|---|---|---|
| M | 16 mm | 1.8 m |
| L | 20 mm | 1.8 m |
| XL | 25 mm | 1.8 m |
Choose a colour and size. Light Blue, Neon Yellow, and Pink are offered on the sizes shown above.
How to use
Clip the hook to the collar or harness D-ring and hold the handle. Check the stitching and hardware before each walk. Wipe it dry after wet weather.
Safety
Supervise your dog. Replace the lead if the webbing, ring, or hook is worn, frayed, or cracked.
More Information
| SKU | rogz-hll-c |
|---|---|
| Brand | ROGZ |
ePet.hk - The Hong Kong Pet Shop